
|
“Japan emergency dwelling construction on fast track following tsunami” September 2011
/ Obara Construction Co., Ltd.
Topcon IS allows one person to survey three distant sites in one day |

Obara Construction Co., Ltd. [352KB]
|

|
“Machine control system enables even compaction throughout the construction area” October 2010
/ Yame-Hodo Co., Ltd.
“The GPT-9000MC system has greatly improved all aspects of our pavement work” |

Yame-Hodo Co., Ltd. [177KB]
|

|
“3D-MC² makes up for lost time” October 2010
/ Bowes Construction
“New technology speeds runway grading” |

Bowes Construction [173KB]
|

|
“The IS has completely changed our as-built survey procedures” September 2010
/ Nagumo Construction Company Limited
“Enhanced progress management has increased quality of construction works” |

Nagumo Construction Company Limited [311KB]
|

|
“Topcon GNSS shortened the work period from one month to two weeks” September 2010
/ Reisui Company Limited
“The GR-2100 has revolutionized our survey procedures that significantly saved time, labor and cost” |

Reisui Company Limited [205KB]
|

|
“The IP-S2 will bring us enormous opportunities” August 2010
/ Kobayashi Consultant Company
“Data collection is so easy, so fast, and so safe. All we need is to drive a car” |

Kobayashi Consultant Company [227KB]
|

|
“Ultra-dense point clouds to visualize details of surface profile” August 2010
/ Tamano Consultants Co., Ltd.
“Visualization has become one of our key technologies that increases customer satisfaction and increases our brand strength” |

Tamano Consultants Co., Ltd. [249KB]
|

|
“Scanning a Historic Wooden Arch Bridge” July 2010
/ Daiken Sokuryo Engineer Company
“Topcon Laser Scanner captures critical data for nomination for World Heritage Site” |

Daiken Sokuryo Engineer Company [181KB]
|

|
“Imaging Capability Eliminates 'Uncertainty'” July 2010
/ Office Inashin
“Topcon’s IS has brought a perfect solution for every challenge I face” |

Office Inashin [211KB]
|

|
“The IS gives me a feeling as if I had an assistant at the tripod side” June 2010
/ Tanaka Kengo Office
“Combined information of coordinates and live images gives clients perfect understanding” |

Tanaka Kengo Office [198KB]
|

|
“Topcon 3D-MC allowed us to pave the complex ramp quickly and accurately” June 2010
/ Watanabe Sato Co., Ltd.
“Veteran Operator Admires Its Accuracy and Ease of Use” |

Watanabe Sato Co., Ltd. [302KB]
|

|
“Machine Guidance System Reduces the Site Preparation Cost by More Than 50 Percent” May 2010
/ Sugadaira-Doken Company Ltd.
“Pocket-3D is Very Easy to Use, Ideal Software for Our System” |

Sugadaira-Doken Company Ltd. [295KB]
|

|
“Topcon GPT Total Stations Allows Us to Constantly Maintain Positioning Accuracy within Millimeters” May 2010
/ Japan Turkey Metro Joint Venture
“After-sales service and technical support expertise offered by Al Fajer - a Topcon dealer in UAE - made our choice easiest” |

Japan Turkey Metro Joint Venture [258KB]
|

|
“Backsight observation capability assures highly accurate reproduction of coordinate systems for periodic monitoring” April 2010
/ Keisoku Net Service Company Ltd.
“GLS-1000 can take data of tunnel walls in a half period of time” |

Keisoku Net Service Company Ltd. [196KB]
|

|
“Design data of farm roads are overlaid on the video images, allowing us to easily identify the profiles to be managed” April 2010
/ Nagumo Construction Company Limited.
“Live Images of Topcon IS Speed Up Stakeout Tasks by Three Times” |

Nagumo Construction Company Limited. [206KB]
|

|
“Despite the different conditions, the finishing accuracy was always stable” March 2010
/ Seikitokyu Kogyo Co.,
“Topcon LPS-900 Provides an Asphalt Paver with ±2mm Accuracy” |

Seikitokyu Kogyo Co., [213KB]
|

|
“Topcon's post processing software is exceptionally user-friendly and makes everything easier” March 2010
/ Korea Ocean Science & Engineering Corporation
“GPS+GLONASS Technology Brings a Dramatic Improvement in Survey Efficiency and Reliability” |

Korea Ocean Science & Engineering Corporation [179KB]
|

|
“3D model is the best tool to give detailed explanations to our clients. (GPT-9000A)” February 2010
/ Tanaka Gumi Co., Ltd.
“Scanning capability allows us to take far more detailed measurements in amazingly shorter time.” |

Tanaka Gumi Co., Ltd. [234KB]
|

|
“System 110 is the best equipment for water-filled paddy preparation (System 110)” February 2010
/ Yamazaki Farm
“LED lightbar guides our courses, eliminating overlaps. It's great.” |

Yamazaki Farm [212KB]
|

|
“Revolutionizing Archaeology with the Latest Scanning Technology” January 2010
/ Saqqara Pyramid Laser Scanning Project
“Scanning for clues - Recording the mysteries of a 4600-year-old pyramid” |

Saqqara Pyramid Laser Scanning Project [958KB]
|

|
“Topcon's Digital Photogrammetry and Robotic Technologies Exponentially Increase Archaeological Survey Efficiency (ImageMasterPRO, GPT-9000A)” January 2010
/ Misuzu General Consultant Company
“ImageMaster PRO cut down data processing time to one third, GPT-9000A reduced time and labor by 50 percent” |

Misuzu General Consultant Company [211KB]
|

|
“Topcon GR-3 and IS Dramatically Increases Job Efficiency in SAudi Arabial NAtional Monorail Construction Project (GR-3, IS)” January 2010
/ ALFAF for trading and contracting LTD.CO.
“Railway construction requires the highest possible surveying technologies to ensure the maximum safety without compromising vehicle speed” |

ALFAF for trading and contracting LTD.CO. [231KB]
|

|
“Excavation, Project Monitoring and Quality Control Using the Same Database (3D-MC excavator guidance system X63)” December 2009
/ Nishio-gumi Company Limited
“Topcon 3D-MC and GPT-9000A streamlined excavation procedures of sand basin in the middle of steep slope.” |

Nishio-gumi Company Limited [234KB]
|

|
“Topcon GLS-1000 Cuts Down Measurement Time by 50 percent (3D Laser Scanner GLS-1000)” December 2009
/ Futaba Consultant Company
“Clients gave high marks to the 3D models so they can overview the landfill status at a glance.” |

Futaba Consultant Company [268KB]
|

|
“Topcon GPS System Revolutionizes Offshore Engineering (GPS Reciever HiPer Pro)” November 2009
/ Fudo Tetra Corporation
“Workboat navigation and water depth measurement can be performed by one single person” |

Fudo Tetra Corporation [206KB]
|

|
“Topcon Machine Control Systems Dramatically Improved Safety, Quality and Productivity (3D-MC, MillimeterGPS)” November 2009
/ Sunago-gumi Corporation
“Excavation speed doubled. Even a novice operator can complete in the same speed with the same quality.” |

Sunago-gumi Corporation [212KB]
|

|
“GPT-9000A saved time by 25 percent and greatly increased accuracy in all phases in construction (GPT-9000A)” October 2009
/ Enoki Industries Company Limited
“Topcon has the best software for us in both functionality and user-friendliness” |

Enoki Industries Company Limited [205KB]
|

|
“Chinese Authorities Recognize the World's Best Technology (TopNET, HiPer-Pro)” October 2009
/ Hefei Institute of Surveying and Mapping
“Topcon GNSS CORS system satisfies all our demands” |

Hefei Institute of Surveying and Mapping [192KB]
|

|
“2-millimeter accuracy of GLS-1000 was quite impressive to us (GLS-1000)” September 2009
/ Sumitomo Densetsu
“Laser Scanner dramatically improves safety and productivity in precise monitoring of road subsidence.” |

Sumitomo Densetsu [268KB]
|

|
“Topcon GNSS increases 'Work Efficiency' by 450% (HiPer Pro)” September 2009
/ Feelit Limited
“It's more important to enhance our survey technology than simply saving the cost.” |

Feelit Limited [191KB]
|

|
“Prism pole on the dozer was wobbly, but the GPT-9000A constantly tracked it. (GPT-9000A)” August 2009
/ Ichiken Company Limited
“We decided to own a robotic total station becausewe can use it both for machine controls and for as-built survey.” |

Ichiken Company Limited [402KB]
|

|
“Topcon's advanced technology helps us with the most challenging tasks (GTS-725 HiPer Series)” August 2009
/ FIBREX
“Seamless data exchange provided maximum flexibility to utilize both of total stations and GPS receivers” |

FIBREX [199KB]
|

|
“Full-robotic capability gave our personnel a more freedom (GPT-9000A)” July 2009
/ MUTUMI CONSTRUCTION Company Limited
“One person can perform as-built survey, the same person can draw a plan back in the office even on the same day.” |

MUTUMI CONSTRUCTION Company Limited [330KB]
|

|
“On-site Training for Cutting-edge Machine Control Systems (MC)” July 2009
/ CMI - Japan Construction Method and Machinery Research Institute
On-site Training Gives Them Right Understanding of Cutting-edge Machine Control Systems. |

CMI - Japan Construction Method and Machinery Research Institute [208KB]
|

|
“I was looking a challenging task (LPS-900)” June 2009
/ Godai Kogyo K.K.
Robotic-based Machine Control System Maximizes Efficiency and Quality in Land Preparation Applications. |

Godai Kogyo K.K. [163KB]
|

|
“Learning the TopSURV was just a breeze (GR-2100)” June 2009
/ Ministry of Housing OMAN
Our surveyors love to use Topcon GPS because it's easier to use and more productive. |

Ministry of Housing OMAN [162KB]
|

|
“Robotic One-man survey for Steep Dam Construction Site (GPT-9000A)” May 2009
/ Nishiura Construction limited company
“Breakthrough technology allows our surveyors to take charge of two or more job sites concurrently, saving considerable time and labor.” |

Nishiura Construction limited company [296KB]
|

|
“Compaction Control System for bypass road construction (GPT-9000A)” May 2009
/ Miyashita Corporation
Topcon Compaction Control System Dramatically Increases Work Efficiency and Quality of Earthworks. |

Miyashita Corporation [249KB]
|

|
“RTK-GPS for as-built survey (HiPer Ga)” April 2009
/ Maeda Corporation
RTK-GPS simplifies operation and drastically decreases time and costs involved in construction surveys. |

Maeda Corporation [309KB]
|

|
“Imaging Station for volume calculation (IS)” April 2009
/ Van oord / Leighton
“Without the IS, we may need at least seven teams instead of two” |

Van oord / Leighton [164KB]
|

|
“Laser Scanning for sediment control dam construction (GLS-1000)” March 2009
/ Kobayashi Consulting Company
High-speed 3D Data Capturing Increases Measurement Efficiency and Reduces Construction Costs |

Kobayashi Consulting Company [548KB]
|

|
“RTK-GPS for layout works at mega construction project (HiPer Ga)” March 2009
/ wade adams
Wade Adams expands productivity with Topcon HiPer Ga |

wade adams [168KB]
|

|
“Machine control for medium or small scale road constructions (LPS-900)” February 2009
/ OBAYASHI ROAD
“A wide range of effects is obtained (work efficiency is 10 to 20% higher) even in a small scale work spot. We will aim to create the IT execution system which can be applied to every scale and process of pavement.” |

OBAYASHI ROAD [162KB]
|

|
“Laser Scanning for 3D Modeling of golf course (GLS-1000)” February 2009
/ GEOKOSMOS
Scanning of Golf course and Soccer Stadium using Topcon 3D Laser Scanner |

GEOKOSMOS [218KB]
|

|
“RTK-GPS for water and sewage pipeline construction (GR-3)” February 2009
/ ADMAC
GPS capability soars in ADMAC's Al-Wathba project |

ADMAC [171KB]
|