“Japan emergency dwelling construction on fast track following tsunami” September 2011/Obara Construction Co., Ltd.
Topcon IS allows one person to survey three distant sites in one day |

Obara Construction Co., Ltd. [352KB]
|

|
“Machine Guidance System Reduces the Site Preparation Cost by More Than 50 Percent” May 2010/Sugadaira-Doken Company Ltd.
“Pocket-3D is Very Easy to Use, Ideal Software for Our System” |

Sugadaira-Doken Company Ltd. [295KB]
|

|
“Topcon GPT Total Stations Allows Us to Constantly Maintain Positioning Accuracy within Millimeters” May 2010/Japan Turkey Metro Joint Venture
“After-sales service and technical support expertise offered by Al Fajer - a Topcon dealer in UAE - made our choice easiest” |

Japan Turkey Metro Joint Venture [258KB]
|

|
“3D model is the best tool to give detailed explanations to our clients. (GPT-9000A)” February 2010/Tanaka Gumi Co., Ltd.
“Scanning capability allows us to take far more detailed measurements in amazingly shorter time.” |

Tanaka Gumi Co., Ltd. [234KB]
|

|
“Topcon's Digital Photogrammetry and Robotic Technologies Exponentially Increase Archaeological Survey Efficiency (ImageMasterPRO, GPT-9000A)” January 2010/Misuzu General Consultant Company
“ImageMaster PRO cut down data processing time to one third, GPT-9000A reduced time and labor by 50 percent” |

Misuzu General Consultant Company [211KB]
|

|
“Excavation, Project Monitoring and Quality Control Using the Same Database (3D-MC excavator guidance system X63)” December 2009/Nishio-gumi Company Limited
“Topcon 3D-MC and GPT-9000A streamlined excavation procedures of sand basin in the middle of steep slope.” |

Nishio-gumi Company Limited [234KB]
|

|
“GPT-9000A saved time by 25 percent and greatly increased accuracy in all phases in construction (GPT-9000A)” October 2009/Enoki Industries Company Limited
“Topcon has the best software for us in both functionality and user-friendliness” |

Enoki Industries Company Limited [205KB]
|

|
“Topcon GNSS increases 'Work Efficiency' by 450% (HiPer Pro)” September 2009/Feelit Limited
“It's more important to enhance our survey technology than simply saving the cost.” |

Feelit Limited [191KB]
|

|
“Prism pole on the dozer was wobbly, but the GPT-9000A constantly tracked it. (GPT-9000A)” August 2009/Ichiken Company Limited
“We decided to own a robotic total station becausewe can use it both for machine controls and for as-built survey.” |

Ichiken Company Limited [402KB]
|

|
“Full-robotic capability gave our personnel a more freedom (GPT-9000A)” July 2009/MUTUMI CONSTRUCTION Company Limited
“One person can perform as-built survey, the same person can draw a plan back in the office even on the same day.” |

MUTUMI CONSTRUCTION Company Limited [330KB]
|

|
“Robotic One-man survey for Steep Dam Construction Site (GPT-9000A)” May 2009/Nishiura Construction limited company
“Breakthrough technology allows our surveyors to take charge of two or more job sites concurrently, saving considerable time and labor.” |

Nishiura Construction limited company [296KB]
|

|
“Compaction Control System for bypass road construction (GPT-9000A)” May 2009/Miyashita Corporation
Topcon Compaction Control System Dramatically Increases Work Efficiency and Quality of Earthworks. |

Miyashita Corporation [249KB]
|